Aircraft Type: o A318 o A319 o A320 o A321 |
List of proposed and agreed Customer Presentations |
| | Customer Choice |
Chapter 3 | |
Item | | |
1 |
Final Mating of section 11-14A to section 15-19 11-14A隔段(前机身段)与15-19隔段(中起落架舱段)的拼接。 | |
2 |
Wing to fuselage, final mating: outside Fwd & rear spar 机翼到机身的拼接完成配合:外机翼前后梁。 | |
3 |
Wing to fuselage, final mating: - upper wing and lower wing – outside 机翼到机身的拼接完成配合:机翼上下表面(外侧) |
|
4 |
Wing to fuselage, final mating: - inside 机翼到机身的拼接完成配合:内部 | |
5 |
Nose gear doors - steps and gaps前起落架门安装报告 | Report |
6 |
Vertical stabilizer to fuselage (post CPC, fairing not installed) 垂尾机身连接处检查 | |
7 |
Presentation before installation of passenger service units and oxygen containers under overhead stowage compartment行李架下方安装旅客服务组件和氧气发生器前的检查 | |
8 |
Presentation before installation of cover light panels under overhead stowage compartment 客舱旅客灯光面板检查 | |
9 |
FWD and AFT passenger/crew doors: functional presentation only前后旅客/机组门检查和功能测试 | |
10 |
AFT cargo door - steps and gaps后货舱门间隙和深度检查 | Report |
11 |
Main gear doors - steps and gaps | Report |
12 |
Wing tanks rib No. 1 to 3: before installation of access panels大翼油箱1、3#肋检查(安装接近面板前) | |
13 |
Lower part of section 18 (post CPC application) 18隔段下部完成防腐处理后后的检查。 | |
14 |
Presentation before installation of carpet in cabin客舱地板检查 | |
15 |
FWD cargo door - steps and gaps前货舱门间隙和深度检查 | Report |
16 |
Presentation before installation of Additional Centre Tank (ACT) | |
17 |
Presentation before installation of ACT heat-shield | |
18 |
Centre wing box before closing中央翼盒关闭前的检查 | |
19 |
Section 19 interior (post CPC application) SECTION 19内部(防腐处理后)检查 | |
20 |
APU compartment with APU installed APU 检查 | |
21 |
Wing front spar area rib No. 1 to 3 and 6, 7 and slat No. 1 attachment (Slats extended) 机翼前梁与缝翼的安装 | |
22 |
Pylon to wing interface connection - before installation of access panels吊架与机翼连接检查 | |
23 |
Belly fairing area before access panels installation (Air conditioning packs) 空调舱检查 | |
24 |
FWD Cargo compartment: Presentation before installation of AFT panels前货舱部分,安装后隔板前的检查。 | |
25 |
Engine installation - Pylon to engine connections -发动机吊架检查 | |
26 |
Main landing gear bay including RAT and landing gear - post CPC application主起落架舱包括RAT检查 | |
27 |
Tracks of inboard flap false rear spar (ribs 1 to 9) 内侧襟翼导轨检查(肋1-9) | |
28 |
Engine pylon before closing of visiting doors观察盖板关闭前,发动机吊架检查。 | |
29 |
Radome: steps and gaps雷达罩边缘的间隙和台阶差检查 | Report |
30 |
Nose gear wheel well including gear前起落架舱的检查 | |
31 |
FWD cargo compartment: Presentation before installation of front panels前货舱前壁板安装前检查 | |
32 |
AFT and bulk cargo compartment after panel installation completion后货舱及散装货舱壁板安装后检查 | |
33 |
FWD cargo compartment after panel installation completion前货舱壁板安装后检查 | |
34 |
Emergency equipment in cabin客舱应急设备检查 | |
35 |
Cabin after installation of seats, floor covering, galleys, lavatories and equipment安装座椅,地板,厨房,厕所和其他设备后的客舱检查(含BFE项目)。 | |
36 |
Aircraft exterior after painting - aircraft livery, servicing inscriptions and other markings (ref. to AM2435 for Acceptance Criteria and reporting) 飞机喷漆后的外表检查,包括飞机水平线,服务标志和其他的标志 | |
37 |
Additional presentation on special customer request | |
| | | |