PDF檔案有助線上兄弟解決問題! 申請加精~
Quick Dispatch Guide A. Electrical power supply - To energize the aircraft electrical circuits external power: (Ref. TASK 24-41-00-861-002) - To energize the aircraft electrical circuits APU  Ref. TASK 24-41-00-861-002) - To de-energize the aircraft electrical circuits external power: (Ref. TASK 24-41-00-862-002) - To de-energize the aircraft electrical circuits APU: (Ref. TASK 24-41-00-862-002) B. Hydraulic power supply - To pressurize the Green hydraulic system: (Ref. TASK 29-10-00-863-001) - To pressurize the Yellow hydraulic system: (Ref. TASK 29-10-00-863-002) - To pressurize the Blue hydraulic system ground power supply:(Ref. TASK 29-10-00-863-003) - To pressurize the Blue hydraulic system electric pump:(Ref. TASK 29-10-00-863-003) - To depressurize the Green hydraulic system: (Ref. TASK 29-10-00-864-001)
C. Missing Fasteners (1) To find the acceptance criteria related to missing fasteners
On fairings:
- For the wing-to-fuselage fairings and belly fairing access-panels: (Ref. TASK 53-35-00-200-002)
- For the belly fairing louver-panel vanes: (Ref. TASK 53-35-00-040-002)
- For the pylon fairing panels: (Ref. TASK 54-50-00-200-003)
- For the vertical stabilizer trailing-edge access-panels: (Ref. TASK55-33-00-200-001) (2) To find the acceptance criteria related to missing fasteners On lining panels: - For the lower deck FWD cargo-compartment: (Ref. TASK 25-54-12-300-001) - For the lower deck aft cargo-compartment: (Ref. TASK 25-55-11-300-001) - For the lower deck bulk cargo-compartment: (Ref. TASK 25-55-12-300-001) - For the ACT integrated impact wall (If installed): (Ref. TASK 28-28-00-200-002)
(3) To find the acceptance criteria related to missing fasteners On engine components: CFM56 ENGINE - For the electrical wire harnesses: (Ref. TASK 71-50-00-210-001) - For the thrust-reverser primary-latch mechanism (blocker doors deployed): (Ref. TASK 78-31-00-210-041) - For the exhaust centerbody (missing rivets): (Ref. TASK 78-11-12-210-042) - For the core nozzle (missing rivets): (Ref. TASK 78-11-11-210-041) - To find the acceptance criteria related to missing fasteners On engine components: V2500 ENGINE For the forward engine mount: (Ref. TASK 71-21-12-200-011) - For the thrust-reverser blocker doors and linkages: (Ref. TASK 78-32-00-200-014) - For the mixed exhaust system: (Ref. TASK 78-10-00-200-012)
D. Maintenance Procedures and Servicing (1) Hydraulic fluid filling and level check - To fill the hydraulic fluid reservoir with a hand pump: (Ref. TASK12-12-29-611-001) - To fill the hydraulic fluid reservoir With hydraulic service cart: (Ref. TASK 12-12-29-611-002) - To do a fluid level check on reservoir indicators: (Ref. TASK 29-10-00-200-001) - To have general rules and main links to hydraulic systems (Bleeding...): (Ref. TASK 29-00-00-910-004) (2) Accumulators and shock absorbers: nitrogen check and filling - To do a nitrogen charge pressure check on hydraulic power accumulators: (Ref. TASK 32-44-11-200-001) (Ref. TASK 29-10-00-200-008) - To do a nitrogen charge pressure check on parking/emergency accumulators by reading gage: (Ref. TASK 29-10-00-200-008) (Ref. TASK 32-44-11-200-001) - To charge the door damper and emergency operation cylinders at theemergency exit doors (If installed): (Ref. TASK 52-22-00-614-002)
(3) Landing gear and wheels: pressure check, inspection and fluid level - To do an inspection of the brakes with or without wheels: AMM32-42-27 PB 601 - To do an inspection of the wheels and tires: AMM 32-41-00 PB 601 - To do a check of the NLG shock-absorber fluid level: (Ref. TASK 12-12-32-611-001) - To do a check of the NLG shock-absorber charge pressure: (Ref. TASK12-14-32-614-004) - To do a check of the MLG shock-absorber fluid level: (Ref. TASK 12-12-32-611-004) - To do a check of the MLG shock-absorber before flight: (Ref. TASK12-14-32-200-001) (4) Engine, IDG and APU oil level - To do an engine oil level check and replenishing: (Ref. TASK 12-13-79-610-002) (Ref. TASK 12-13-79-610-011) - To do an IDG oil level check and replenishing: (Ref. TASK 12-13-24-612-041) (Ref. TASK 12-13-24-612-010) - To do an APU oil level check and replenishing: (Ref. TASK 12-13-49-612-001)
(5) Fuel: Refueling - To do a pressure refueling with automatic control: (Ref. TASK 12-11-28-650-003) - To do a pressure refueling with manual control: (Ref. TASK 12-11-28-650-004) - To do a pressure refueling without electrical power: (Ref. TASK 12-11-28-650-005) - To do an overwing refueling: (Ref. TASK 12-11-28-650-006) - To drain the tank water content: (Ref. TASK 12-32-28-281-001) (6) Oxygen - To do the replenishing of the passenger oxygen cylinder (Ifinstalled): (Ref. TASK 35-21-00-614-002) - To do an inspection of the crew oxygen cylinder pressure: (Ref. TASK 35-10-00-200-001) (7) Lights: Tests - To do a functional test of the emergency lights in the cabin by LIGHT EMER pushbutton switch: (Ref. TASK 33-51-00-710-007) - To do a functional test of the emergency lights in the cabin by TEST EMER LIGHT SYS pushbutton switch: (Ref. TASK 33-51-00-710-001) - To do a check of all cabin lights and signs: (Ref. TASK 33-51-00-710-009)
(8) Potable water and waste - To fill the potable-water tank system with aircraft electrical power: (Ref. TASK 12-15-38-613-001) - To fill the potable-water tank system without aircraft electrical power: (Ref. TASK 12-15-38-613-002) - To drain the potable water system with electrical power: (Ref. TASK12-24-38-680-001) - To drain the potable water system without electrical power: (Ref. TASK 12-24-38-680-002) - To do the servicing of the toilet system: (Ref. TASK 12-16-38-613-001) - To do the servicing of the liquid soap dispencer: (Ref. TASK 12-16-25-613-001) E. Standard Practices (1) Airframe and System - To find the standard procedures: AMM 20-20-00 PB 001 - To find the standard torques: AMM 20-21-00 PB 001 - To find the installation and repair of tubings: AMM 20-23-11 PB 201 - To find the bonding procedures: AMM 20-28-00 PB 201 (2) Engine - To find the wiring standard procedures: AMM 70-71-00 PB 001 - To find the standard torques: (Ref. TASK 70-23-00-911-002) (Ref. TASK 70-23-00-911-013) - To find the nacelle maintenance procedures: (Ref. TASK 70-60-00-910-041) (3) Electrical - To find the electrical standard procedures: (Ref. ESPM 20-51-00) - To find the electrical repair procedures: (Ref. ESPM 20-53-00) - To find the electrical cleaning procedures: (Ref. ESPM 20-55-00) |